Rooftop Solar Installation Process Step by Step Walkthrough
A transparent, step-by-step guide to what happens when you install rooftop solar in Assam — from the initial engineering survey to mounting, APDCL net metering, and final commissioning.
The 7 Steps from Survey to Clean Power
- 1. Technical Site Survey: Analyzing roof orientation, sun path shadow modeling, structural load-bearing capacity, and existing APDCL service wiring.
- 2. Custom Engineering Design: Generating a 3D layout optimized for maximum sun exposure and determining module tilt (15°–20° south facing for Assam).
- 3. TFA & Discom Sanction: Submitting technical feasibility paperwork on the PM Surya Ghar national portal and obtaining official APDCL approval.
- 4. Structure & Module Mounting: Erecting corrosion-resistant hot-dip galvanized mounting structures and bolting high-efficiency DCR solar panels.
- 5. Inverter & Safety Wiring: Installing grid-tied MPPT inverters, DC/AC distribution boxes with surge protection devices (SPD), and dedicated chemical earthing pits.
- 6. APDCL Inspection & Net Metering: APDCL utility engineers inspect the installation and install a bi-directional smart net meter.
- 7. Commissioning & Handover: Energizing the system, connecting mobile app monitoring, generating commissioning certificate, and filing the DBT subsidy claim.
What Distinguishes an Engineered Installation
- Cyclone-Resilient Framing: Heavy-gauge galvanized steel engineered to withstand Assam's severe storms and high wind gusts.
- 100% Waterproof Sealing: Non-invasive fastening and UV-resistant chemical sealants that protect your roof from any leakage.
- Triple Earthing & Lightning Protection: Dedicated earthing for AC, DC, and lightning arresters to safeguard home appliances.
- UV-Resistant DC Cabling: Flame-retardant solar DC cables routed neatly through conduits for minimum transmission loss.
After Installation Support
Once commissioned, your system automatically offsets daytime electricity use and exports surplus power to APDCL via net metering. Residential customers receive up to ₹1,30,800 in combined subsidies under PM Surya Ghar. Learn about routine care in our maintenance guide.
Solar calculator
Estimate your system size and savings.
Use our calculators to estimate the system you need from your monthly bill, your generation, savings and payback period. Results are labelled estimates with their assumptions.
- System size calculator
- Savings calculator
- Generation calculator
- Payback calculator
- Panel area calculator
Related pages
FAQ
Common questions
What happens during an on-site solar survey?
Our engineers inspect roof orientation, structural strength, tilt angle, nearby trees/structures for shadow patterns, electrical distribution box, and your historical APDCL bill consumption.
Will solar panel installation damage my roof or cause leaks?
No. We use non-penetrative clamp mountings for tin roofs and anchored, weatherproof chemical sealed base-plates for RCC concrete roofs to preserve 100% roof integrity.
How long does the entire installation and approval process take?
The physical rooftop assembly takes only 2 to 4 days. APDCL net metering approvals, bi-directional meter installation, and commissioning usually take 2 to 3 weeks.
What is the commissioning process?
It is the comprehensive safety and performance testing conducted before synchronizing with the grid. APDCL verifies earthing resistance, anti-islanding safety, and grid compliance.
Book a rooftop site visit
Share a few details and our team will help you size the right system. No obligation.
Sewaro Energy service information
Tell us about your roof and electricity use. We'll recommend the right system and handle subsidy and net-metering paperwork where applicable.
Ready to power your home with solar? engineered to last.
Tell us about your roof and your electricity bill. We'll help you size the right system and handle the subsidy and net-metering paperwork.