Skip to content
Sewaro Energy
Sewaro Energy Guwahati, Assam

Rooftop Solar Installation done properly across Assam.

Rooftop solar installation in Guwahati and across Assam — an engineering-led process from roof assessment and design to certified installation, commissioning and APDCL net-metering support.

Rooftop Solar Installation

Installation is where quality is won or lost

Panels and inverters get the attention, but the installation decides whether your system delivers for 25 years. Correct structure, sealed penetrations, protected wiring, proper earthing and careful commissioning are what keep a rooftop system safe and productive through Assam's weather.

Our installation process

Stage What happens
Roof assessment Roof type, condition, shadow-free area, tilt and direction
Design Array layout, structure design, stringing and routing
Preparation Materials, structure placement and roof protection
Installation Mounting, panel fitting, inverter and wiring
Commissioning Testing, safety checks and handover
Connection Net-metering formalities with APDCL

Built for Assam's climate

Monsoon rain, strong winds and humidity place demands on every rooftop system. We design mounting structures for wind loading, ensure proper water drainage, and protect exposed cabling and connections so performance holds up season after season.

Net metering and approvals

After installation, grid-connected systems go through the APDCL net-metering process. We help with the paperwork so your exported units are accounted for. See APDCL net metering for the details, and PM Surya Ghar for subsidy.

After handover

We help you understand your monitoring, then stand behind the system with maintenance and repair. Read more in solar maintenance.

Solar calculator

Estimate your system size and savings.

Use our calculators to estimate the system you need from your monthly bill, your generation, savings and payback period. Results are labelled estimates with their assumptions.

  • System size calculator
  • Savings calculator
  • Generation calculator
  • Payback calculator
  • Panel area calculator

Related pages

FAQ

Common questions

Will installation damage my roof?

We design to protect roof integrity and use appropriate mounting methods for your roof type. Any penetrations are properly sealed. A pre-installation survey identifies risks before work begins.

How long does rooftop installation take?

The physical installation is usually completed in a few days for residential systems, depending on size, roof access and weather. Approvals and net metering follow the installation.

How do you handle Assam's monsoon?

Structures are designed for wind loading and water drainage, and cables and connections are protected so the system performs reliably through the rains.

What happens after installation?

We test and commission the system, guide you on monitoring, and support the net-metering steps. Ongoing maintenance is available through our solar maintenance service.

Book a rooftop site visit

Share a few details and our team will help you size the right system. No obligation.

Chat on WhatsApp

Your details are used only to respond to your enquiry. See our privacy policy.

Sewaro Energy service information

Tell us about your roof and electricity use. We'll recommend the right system and handle subsidy and net-metering paperwork where applicable.

Ready to power your home with solar? engineered to last.

Tell us about your roof and your electricity bill. We'll help you size the right system and handle the subsidy and net-metering paperwork.